Greeneview Local Schools needed working office space at its bus barn outside Jamestown, Ohio — somewhere for transportation staff to sit, meet and use a restroom without driving back to the district office. Instead of building from scratch, the district bought a 24 by 60 foot doublewide modular unit, new in 2021, and had it set on a permanent foundation at the bus barn site under an SWOEPC design-build contract.
The unit holds four 12 by 12 offices, two ADA-compliant restrooms and an open central meeting area, finished with VCT flooring and VCG wall finish. It sits on 32 below-grade concrete piers, 24 inches round by 36 inches deep, block leveled with seam seal at 35 inches above finished grade on single-stack CMU. Painted T1-11 wood skirting closes the crawl space with cross-drive anchors. Access is by new adjustable OSHA-compliant aluminum steps and a 36-foot straight-run aluminum ramp with a rest platform, with a switchback available if the site slope called for one.
Getting services out to it was its own job. The electrical work reused the existing raceway, the 200-amp meter and the existing 200-amp 120/240-volt panel left from the site's temporary power setup, feeding a 100-amp trailer panel off an existing breaker and a 125-amp trailer panel off a new one. Plumbing meant two trenches: roughly 150 feet at about four feet deep to tie the drain into the existing PVC main, and roughly 200 feet at 48 inches deep from the waterline tie-in on the east side of the main building. Prodigy produced the stamped engineered foundation and site plan drawings and filed the architect permit with Greene County. The district ends up with permitted, finished office space at the bus barn.