Northland High School's auditorium in Columbus was being operated from a crow's nest. The sound and lighting boards sat in the mezzanine, above and behind the house, which is where boards were commonly put when the room was built and is a difficult place to run a show from now. The seating on both levels had reached the end of its life, the stage rigging and curtains were original, and the floor finishes included material that had to be abated rather than simply removed.
Columbus City Schools included the auditorium in a refresh of the gym and auditorium carried on a pre-bid Gordian job order contract. The auditorium scope replaces the lower level and mezzanine seating, with ADA seating provided on the lower level; relocates the sound and lighting boards down to the lower level onto a new lockable desk; and replaces the stage curtains and rigging, the stage theatrical lighting, the auditorium sound system with new wireless microphones, the projector and motorized screen, the first and second floor entrance doors, and the stage ceiling, which becomes a black grid with tiles.
The stage floor is sanded, refinished and stained. VCT flooring comes out, asbestos flooring components are abated, and carpet goes down in its place. Walls, ceilings and the bare concrete under the seats are painted, and the interior doors that remain are repainted. Aisle lighting is added, either in the floor or in the seats. An acoustician evaluates the room before new acoustical treatment is furnished. On the mezzanine, the accordion partition is removed and the handrail is investigated to determine whether it has to be raised.