Groveport Madison Schools had six elementary playgrounds in six different states of repair and one summer to deal with all of them. Rather than take a site a year for six years, the district put the whole set into a single 2025 contract covering playground structures, mulch surfacing, and perimeter fencing and gates at Asbury, Dunloe, Glendening, Groveport, Madison and Sedalia elementary schools.
Five of the six — Asbury, Dunloe, Groveport, Madison and Sedalia — receive a new PK–5 play structure, with the color theme at each site chosen by the district. Glendening receives no new structure; its work is fencing, mulch and an asphalt patch at an identified trip hazard, installed to reduce the step-off onto the grass. Where existing equipment stood inside the footprint of a new structure, at Groveport and at Sedalia, the district removes it to clear the space.
Mulch is topped off in every playground area at all six sites. Six-foot fencing goes in along the runs identified on each site plan, with swing gates at the identified points; where new fence ties into an existing four-foot or five-foot run, the new fence matches the height it meets rather than stepping up against it. The result is five new structures, refreshed surfacing at six playgrounds, and a fenced, gated boundary around each play area — bought pre-bid on a TOP-C unit price contract, on one set of documents rather than six.