Gym roofs are large, flat and out of sight, which is why they are usually the last roof a district takes on. Finneytown Local School District took the lower gym at its Secondary Campus in Cincinnati down to the metal deck instead of covering it over, and the contract names the standard the new assembly answers to: current Ohio Building Code.
What goes back on is a fully tapered, glass-reinforced polyisocyanurate insulation package fastened to the deck at an average R-31, premanufactured drain sumps at every drain, and a Carlisle 90-mil EPDM membrane with six-inch factory-applied seam tape adhered over the top of it. The membrane is wrapped up and over the perimeter walls and locked down with new 24-gauge cleat and edge metal; wall details are finished with a sealed termination bar and metal counter flashing.
The electrical conduit that had been mounted to the lower roof's edge metal was removed and reset on rubber supports a few feet back from the edge. That is a small line in a large contract and it is the kind that decides whether a roofer working up there years from now has to dismantle the conduit to reach the perimeter.
The district's return on a tear-off is not only a dry gym. Tapered insulation means the roof drains rather than holds water, and the higher compressive strength of the board means traffic across the field of the roof does not slowly work the membrane loose from what is under it. The system carries a 40-year Carlisle warranty, and the job was bought through a pre-bid unit-price contract held with The Ohio Purchasing Council.